Overview
Via the invitation link, your suppliers open the EUDR data request form in Polygon One. There they provide the requested EUDR compliance evidence for the requested articles — without their own user account. This page helps you as a buyer explain the process. Share the EUDR supplier guide with suppliers. The invitation link opens the relevant request directly; suppliers do not need to open your supplier list or buyer settings.Access is via a secure link from the invitation, without separate registration. The supplier can reopen the link while it remains valid to provide missing data or update their information.
Step-by-Step Guide
1. Access and Welcome
The supplier opens the link in the invitation email. On their first visit they check their general information. On later visits, the link may open the overview with Tasks and Articles directly; a specific follow-up can open the relevant item. A new welcome page is therefore not expected on every visit. Opening the link and filling it in for the first time normally need no code. The form requests email verification for protected changes. As soon as something has been submitted for a request (articles provided, questionnaire answered, plots or evidence uploaded), the link is protected against changes: the supplier then receives a 6-digit one-time code by email. See One-time code and security contact.2. General Information
After the supplier opens the link, they see the form for the EUDR data request.1
Enter company name
The supplier enters their official company name.
2
Provide address
The supplier enters their company address.
3
Select country
The company’s country is selected.
4
Continue
Click “Continue” to proceed to the next step.
The supplier can change the language of the form at any time. Available are German, English, French, Spanish, and Chinese.
The “General information” step also contains the field “Email for security codes”. The supplier enters an address they can read themselves and confirms it with a code. Before the final submission this confirmation is mandatory — see One-time code and security contact.
3. Select Articles and Provide Geo Information
In the Articles overview, the supplier selects the affected articles and opens the relevant action. Existing data, specific follow-ups and progress determine the next step. They do not have to complete every form in sequence on each visit. For relevant articles, they provide the requested origin data or enter the applicable alternative coverage:1
Specify the commodity producer
Enter the name of the commodity producer and the country of production.
2
Provide geo data
Under “Relevant Geo information” the supplier picks one of six routes. The first four supply plots; the last two explain why no plots are needed for the share in question:
- Draw plots on the map — mark the corner points
- Upload a file (GeoJSON, CSV, Excel) — import plots from a GeoJSON, CSV, or Excel file; “Download template” offers an Excel and a CSV template for it. The importer only asks for the values the file does not carry per row itself: the producer name and the production period stay on screen as fields but lose their required mark and name the column used below them. Where wood has no species or point coordinates no area, the importer asks for those in addition; if the file carries them, the question does not appear
- Enter coordinates — type the latitude and longitude of each plot directly, with no map and no file, plus the plot area in hectares
- Use certificate with coordinates — read the coordinates out of a certificate; the hits come back as proposed plots for the supplier to confirm
- Covered by an existing DDS — reference and verification number of an upstream due diligence statement
- Post-consumer recycled material — the recycled quantity per article
3
Repeat for all articles
Check all requested articles. Missing origin information remains visible; an existing DDS or recycled-material entry is not an automatically accepted clearance.
4. Invite Sub-Suppliers (Optional)
If the supplier sources materials from additional sub-suppliers, they can invite them in the portal:- describe the inbound article (name, article number, HS code — mandatory)
- enter the supplier details of the sub-supplier (company, email)
- optionally add a personal message
- the invitation is sent to the sub-supplier by email
5. Legal Compliance Questionnaire
The questionnaire is a step wizard, not one long page. A step indicator runs along the top (“Step 3 of 6”), and under the heading each step states its purpose in one sentence. The number of steps is not fixed: it follows from the commodity and from what is already covered. “Forestry & wood use” only appears for wood, and a category covered by a recognized certificate or by evidence that was already accepted gets no step of its own.1
Step 1: “General & supply chain”
Where the goods come from and how they travel — and, where the request captures them, the parties in the supply chain. This is also where the supplier uploads their certifications (FSC, PEFC, ISCC …); the analysis determines which compliance categories they cover. For wood products from countries with an operational FLEGT licensing scheme (currently Indonesia) the FLEGT license belongs here too — with a valid license the detailed questionnaire is skipped for the affected articles.
2
Then one step per legal category
Land use rights, Environmental protection, Forestry & wood use (wood only), Third-party rights, Labor & human rights, Tax, trade & customs — each step with its own questions and its own upload for exactly that category (PDF, JPG, or PNG).
3
Last step: “Other documents & submit”
Anything that fits no category goes under “Drop your other documents here”; the supplier then reviews their answers and submits. Anti-corruption and further compliance measures are asked here.
When the supplier cannot provide a document
If a required document does not exist in their country or for their operation, the step is not a dead end: next to the notice sits “I cannot provide this document”. The supplier has to write a reason (mandatory) and sends it with “Send statement”; the step is no longer blocked afterwards, and the form then shows “You stated that no document exists for this requirement: …” with “Correct this” beside it. A statement applies per category and per country of production. The decision is yours. If you accept the statement, the requirement is not met — the category stays open, counts and status do not change; what is recorded is only that you reviewed the statement. If you reject it, the step asks for the document again and your supplier reads your reason: “Your buyer did not accept your statement: …” A reason is mandatory when rejecting. After saving or submitting, Polygon One processes the information according to enabled features and analysis settings. This includes geo analysis, document analysis and compliance-status updates. Submitted means the answer is available — it does not mean every open item is accepted or every article is compliant. Review results and outstanding questions on the buyer side.The supplier can reopen the link for a valid period to view the status of their submissions, provide missing data, or update information.
Dropping Documents and Having Them Read
The collective drop zone with automatic recognition is enabled per workspace. Without it the zone does not appear — and with it neither the automatic reading, nor the per-file receipt, nor the “next step” section; your supplier then uploads their evidence in the step of the relevant category.
The “Tasks” Tab
Every request you send — or that is sent automatically — appears for the supplier in the Tasks tab, grouped into To do, Submitted – under review and Recently completed. There is one card per requested point: title = field or question, below it category · country · file, the reason in plain words, and on the right the matching action (“Open document”, “Update plot”, “Update answer”). One click takes them straight to the quoted file or the affected plot. When your supplier opens the request it moves to Viewed and you are notified. The step-by-step view from the supplier’s perspective is in the supplier guide.One-time Code and Security Contact
The invitation link is an address, not a credential. A one-time code therefore protects changes to data that has already been submitted.
The code goes to the email address you have on file for that supplier, is valid for 15 minutes, can be used once, and allows five attempts. Only the newest code ever counts. If the supplier confirms, under “Email for security codes”, the address that already serves as the code mailbox, no second code is required; a brand-new address takes two codes — one to the current mailbox, one to the new one. From then on, one-time codes go to the confirmed address. The code email is copied to nobody — not even to you.
If a supplier has several confirmed mailboxes — for example because you added a second contact person and that person confirmed their own address — the dialog first asks where the code should go. The addresses appear masked (
d***@example.com).
For the sensitive operations, the audit log records which code mailbox confirmed the change. A missing entry means “not challenged” — never “unknown person”.